
MANAGEMENT
The project would involve construction of infrastructure for communication and electrical improvements for the existing baseball, softball and soccer fields. The existing fields do not have access to electricity to support lighting or an audio system. The project would require trenching for new power and communication lines, a service pad area. The project also includes the construction of a concrete block equipment shelter with an adjoining concrete block generator enclosure south of the existing baseball field. The equipment shelter would have a maximum height of 10-feet and be constructed on a new concrete pad with outdoor transformer.
Construction is scheduled to begin in 2024. Please check back for project updates.
A copy of the Draft Initial Study- Mitigated Negative Declaration (IS-MND) can be reviewed at the California State University, San Marcos Office of Planning, Design and Construction during regular business hours, located at 441 La Moree Road, San Marcos, CA 92078. The document is also available for viewing online at here:
Initial Study - Mitigated Negative Declaration
Project Manager:
Rajesh Badri
Projected Project Cost:
$1,437,804
Funding Source:
大发 Student Affairs
Completed: December 2025